Markus Butkereit
Recently Works Information Contact
Turnaround - Experiment No.45b
Turnaround - Experiment No.45b
Material/ Forklift, europallet, coppercylinders
Measures/ 500 x 200 x 200cm
2017/ Berlin/ Germany
Set-Up and Execution/
A 1 m3 hole is dug. The hole is filled with concrete out of which projects 15 cm lengths of four steel U-bolts. The lengths of the U-bolts correspond with the length of the prongs of the fork lift, thus fitting into the U-bolts. The lift mast of the forklift is fully extended. A Manitou turns the forklift upside down and the fork is pushed through the four U-bolts. A Euro pallet with six copper cylinders is placed on top of the concrete foundation.
Supposition/
The forklift is upside down.
«««